We use cookies to ensure that we give you the best experience on our website. If you continue without changing your settings, we'll assume that you are happy to receive all cookies from this website. If you would like to change your preferences you may do so by following the instructions clicking on More.

Consolidation Works, Slope Stabilization, Soil Treatments

 

  • Civil Engineers works in support to the excavation and construction works of the exploring tunnel at La Maddalena site - Sector 1. Works for the soil depot site related to the opening of the exploring tunnel at "La Maddalena" site in Chiomonte Municipality (Torino). - Final design. LTF Lyon Turin Ferroviaire sas (2013 - today).
  • Consolidation works of the municipal road "Via Vecchia del Piano" and consolidation of the mounatinside downhill of the ancient centre in Clavesana Municipality. Preliminary and detailed design. Clavesana Municipality (CN). (2012 - today).
  • Consolidation works of the hillside at the locations of San Michele, Fey, Gerbido and San Giovanni Lontano in the Bra Municipality. Preliminary, detailed and final design, Works supervision, management of health and security during construction. Bra Municipality (CN). (2012 - today).
  • Remediation works of the walls of Bene Vagienna Municipality. Preliminary, detailed and final design, Works supervision, management of health and security during construction Bene Vagienna Municipality (CN). (2012-today).
  • Hydraulic and hydrogeological remediation of the sideslope over the inhabited centre of Ceres Municipality. Preliminary, detailed and final design, Works supervision, management of health and security during construction. Ceres Municipality (TO). (2012 - today).
  • Urgent works for the construction of the earth retaining structures and the consolidation works of the sideslope downhill the inhabited centre of Montezemolo Municipality (CN). Sector 2 - Track 1. Design, works supervision, management of health and security during construction. Comunità Montana "Alto Tanaro Cebano Monregalese". (2011 - today).
  • Consolidation works of the sideslope "Truina" near the inhabited centre of S. Stefano Roero Municipality (CN). Preliminary, detailed and final design, Works supervision, management of health and security during construction. S. Stefano Roero Municipality (CN) (2011 - today).
  • Cortemilia Municipality (CN). Province Road no. 429. Sector: Castino to Province Road no. 2 at Pezzolo. Consolidation works and restoration of the bridge upon the Bormida River in the inhabited centre of Cortemilia. Preliminary, detailed and final design, Works supervision, management of health and security during construction. Province di Cuneo (2011 - today).
  • Urgent works for the construction of the earth retaining structures and the consolidation works of the sideslope downhill the inhabited centre of Montezemolo Municipality (CN). Sector 1. Design, works supervision, management of health and security during construction. Comunità Montana "Alto Tanaro Cebano Monregalese". (2011 - 2012).
  • montezemolo1

  • National road no. 231 "di Santa Vittoria"- Bridge on Tanaro River at Govone (Cuneo). Consolidation works of bridge foundations on Tanaro river from km 16+200 to km 16+900. Consultancy and construction drawings of the consolidation works of a viaduct piles. Impresa Zoppi srl. (2010 - 2011).
  • Municipality of Noli (Savona). Construction of a new underground parking and urban reclamation of the railway areas. Design of the final works for sideslope stabilization. Impresa Z & R. (2010 - today).
  • Municipality of Bussoleno (Torino). Consolidation works of earth retaining structures along municipal roads damaged by the flood in May 2008. Preliminary, detailed and final design, Works supervision, management of health and security during construction Municipality of Bussoleno (Torino). (2010 - 2012).
  • Municipality of Bussoleno (Torino). Stabilzation works of the landslide near Rocciamelone creek at 1200 to 1500 m above ground level due to the flood of May 2008.Preliminary, detailed and final design, Works supervision, management of health and security during construction Municipality of Bussoleno (Torino). (2010 - 2012).
  • Municipality of Monchiero (Cuneo). Rea River. Ordinary and extraordinary maintenance works in the sector from the bridge of the provincial Road no 661 to Cascina Colombera site. Preliminary, detailed and final design, Works supervision, management of health and security during construction Municipality of Monchiero (Cuneo). (2009 - today).
  • Provincial Road no 35 - Land sliding involving the roadway in the Municipality of Roburent (Cuneo). Preliminary, detailed and final design, Works supervision, management of health and security during construction. Provincia di Cuneo. (2009 - 2012).
  • Environmental and landscape reclamation of the quarry "Sada" an dboundary areas. Preliminary, detailed and final design, Works supervision, management of health and security during construction. Comune di Avigliana (Torino). (2009 - 2011).
  • XX Winter Olympic Games at Torino (2006). A32 Highway - Sector Savoulx-Bardonecchia. Extraordinary maintenance for the improvement of the safety conditions needed from the construction of a fourth line. Works on reinforced earth and sideslopes from Pk 65+00 to Pk 72+385. Technical consultancy and assistance to work supervision. MUSINET Engineering SpA. (2009).
  • SP 164 - Geological and geotechnical evaluation of the landslide at Bagnaschino site (Cuneo).Feasibility studies of technical remediation measures to be adopted. Province of Cuneo. (2008-present).
  • SP 212: km 4+500 - Municipality of Moncenisio (TO) - First remediation works of a road section break down due to a landslide occurred on April 6th, 2007. Technical studies on the local situation and remediation works coordination. Province of Torino. (2007).
  • SP : km 46+350 - Municipality of Ala di Stura (TO) - Geological and geomechanical studies, Works Direction and Security and Health Management of the first remediation works of the road break down due to the landslide occurred on May 25th, 2007. Province of Torino. (2007).
  • ala02

  • Preliminary, detailed and final design, Works direction, security and health management of the works for reclamation and consolidation of the hillside damaged by an old landslide in the territory of Ceres Municipality. Municipality of Ceres (2006 - present).
  • Avigliana Municipality (TO). National Road SS589 "Laghi di Avigliana". Reclamation of the damaged section between km 4+800 and km 5+200, on "Quarry Sada" site. Geological studies, preliminary, detailed and final design, assistance to the works direction. Province of Torino (2005 - 2006).
  • Municipality of Barbaresco (Cuneo). Consolidation works of the "Rocche di Barbaresco". Geological studies, preliminary, detailed and final design Design of the consolidation works and stabilization of the sideslope. Municipality of Barbaresco (Cuneo) (2005 - present). pdf icon
  • Regional Road "ex SS 10" Padana Inferiore (TO). Works direction and security and health management during works of the first remediation works of the Tunnel cap "Pino" from km 9+500 to km 10+500. Province of Torino (2005).
  • Municipality of di Salza di Pinerolo - Site Rodoretto (Torino). Geological studies, design of the works for first remediation and complete design for the reclamation works of the Provincial road no. SP260 from km 0+400 to km 0+700. detailed and final design, Works direction, Security and health management during works. Province of Torino (2005).
  • rodoreto

  • Avigliana and Trana Municipalities (Torino). External ring road SS589 "Laghi di Avigliana". First remediation works for the removal of the soil from the area interested by the landslide and storage in the nearby Sada quarry site. Detailed and final design. Province of Torino (2004). pdf icon
  • Torino Subway. Section 1 Lot 5 (Acaja - Porta Nuova). Constructive design and works supervision of the soil stabilization works preparatory to the mechanized excavation of the tunnel. Studio Geotecnico Italiano. (2004).
  • Final design of the monitoring activities and remediation works of the landslide at Ceres (Torino). Municipality of Ceres (2003-2004).
  • A32 Highway. Geological-geomorphological, hydrogeological and geotechnical-geomachanical studies of the mountainside landslide Millaures. SITAF SpA (2003-2004).
  • Geological studies and surveys for the design of the geotechnical monitoring program of the landslides along the mountainsides of the National road SS23 "Sestriere". Bonifica SpA (2003-2004).
  • Preliminary, detailed and final design of the hydrogeological remediation works of the hillside selected for the construction of the new hospital Alba-Bra (Cuneo). Local Health Authority no. 18 (2003 - 2004).
  • Design and works direction of the first consolidation works of the rocky sideslope underlaying the town centre of Pianezza (Torino). Municipality of Pianezza (2001). In co-operation with Studio Siniscalco, Torino.
  • Design and direction of the stabilization works of the Barbaresco Tower and of the underlaying sideslope. Municipality of Barbaresco (Cuneo) (1999-2001).
  • barbaresco tower

  • Hydrogeological instability over Civiasco (Vercelli) built-up area: studies of the actual local situation and design of the stabilization works. Comunità Montana Valsesia (VC) (1998)..
  • Preliminary design of the stabilization of the rocky sideslope underlaying the S. Sebastiano Chapel ande 1° Maggio square damaged by the flood occurred in 1994 - Municipality of Pianezza - Province of Torino. SI.ME.TE (1996).
  • Landslide under the building of the missionary sisters of Holy Hearth of Jesus at San Raffaele Cimena Municipality (Torino) - Design and direction of the remediation works . Missionary sisters of Holy Hearth of Jesus Cabrini (1995).
  • Fondovalle Sele road. Design of the works for the Vallipote landslide stabilization. Consorzio CO.IN.FRA (1995).
  • Hydrogeological remediation of San Bartolo Mountain - Consolidation works of the rocky sideslope near the bulit-up area of Fiorenzuola di Focara (Pesaro). Municipality of Pesaro (1995).
  • Fondovalle Sele road. Design of the consolidation works of a road section. Consorzio CO.IN.FRA (1995).
  • Works for hydrogeological stabilization of the southern hillside of the built-up area at Atessa and of the eastern hillside of the built-up area at Gissi. Lombardini Constructors (1992 - 93).
  • Hydraulic and sanitary reclamation of San Rocco riverbed and related drainage tunnel in the sewer at Secondigliano. Pianese Constructors (Napoli) (1992).
  • A6 Torino-Savona Highway - Design of stabilization of the excavation face resulting from the works for the improvement of the highway route at Priero site. Società Autostrade (1991).
  • Design of the consolidation works of the rocky sideslopes along the road network external to the Municipality of Bisaccia. Lombardini Constructors (1989).

 